超凈工作臺安裝確認書
驗證方案的批準Approval of the Validation Protocol
審核和批準了相關SOP、標準和日程表之后在下表簽字Sign here after reviewing and approving the SOPs, standards and schedules
目錄Table of Contents
1 通用說明和先決條件GENERAL INSTRUCTIONS AND PREREQUISITE 3
1.1 目的和范圍OBJECTIVE AND SCOPE 3
1.2 設備或儀器描述EQUIPMENT/INSTRUMENT DESCRIPTION 3
1.3 主要組件列表MAJOR COMPONENTS LIST 3
1.4 術語和定義TERMS AND DEFINITIONS 4
2 責任RESPONSIBILITIES 4
3 文件DOCUMENTATION 5
3.1 完成本文件COMPLETION OF THIS DOCUMENT 5
3.2 文件列表QUALIFICATION DOCUMENTS LIST 5
4 公用設施要求UTILITIES REQUIREMENTS 6
4.1 公用設施列表UTILITIES LIST 6
5 列舉需要檢定的項目CALIBRATION ITEMS 6
6 安裝、接線、安全和外觀檢查INSTALLATION, HOOKUP, SAFETY AND PHYSICAL INSPECTION 7
7 預防性維護和安全評估PREVENTIVE MAINTENANCE AND SAFETY ASSESSMENTS 7
7.1 預防性維護PREVENTATIVE MAINTENANCE 7
7.2 安全評估SAFETY ASSESSMENT 7
8 缺陷報告附件列表DEFICIENCY REPORT ATTACHMENTS LIST 7
9 批準 APPROVALS 8
9.1 臨時批準INTERIM APPROVAL 8
9.2 最終批準FINAL APPROVAL 8

1??????????通用說明和先決條件General Instructions and Prerequisite
1.1????????目的和范圍Objective and Scope
通常一份方案包含以下方面The different aspects that a normal protocol would address are:
I.?????????????主要組件列表Major Component List
II.??????????所需文件Required Documents
III.????????公用系統(tǒng)需求Utility Requirements
IV.????????檢定Calibration
V.??????????安裝、接線、安全和外觀檢查Installation, Hookup, Safety and Physical Inspection
VI.????????預防性維護需要Preventive Maintenance Requirements
VII.?????缺陷報告附件列表:一份顯示安裝確認過程中產(chǎn)生的缺陷報告和缺陷報告狀態(tài)的列表
Deficiency Report Attachment List: a list of the deficiency reports produced during the Installation Qualification and their status.
VIII.???證明Certification
這份方案描述超凈工作臺,編號MEC-06-02的安裝確認程序。這臺設備安置于1410。This protocol will define the procedure to be followed for the installation qualification of theLaminar flow cabinet,?No.:MEC-06-02. It is located in the1410.
1.2????????設備或儀器描述Equipment/Instrument Description
此設備或儀器放置在細胞培養(yǎng)間,房間號1410。
The Equipment/Instrument located in room No1410ofcell culturelab.
| 所需信息Required Information | 實際上As Found |
| 生產(chǎn)商Manufacturer | Esco Micro Pte. Ltd. |
| 訂單號Purchase Order # | N/A |
| 型號Model # | ACB-6A1 |
| 設備編號Equipment Identification # | MEC-06-02 |
| 位置Location | 1410 |
| 圖紙?zhí)朌rawing Number | N/A |
1.3????????主要組件列表Major Components List
| 組件名稱# Item | 描述Item Description | 型號/序列號Model/ Serial # | 生產(chǎn)商Manufacturer | 手冊Manual # | |
| 工作臺箱體
The worktable box |
主體框架
The main body frame |
N/A | ESCO | User? manual | |
| 玻璃防護窗
Front glass screen |
調(diào)節(jié)操作口的高度
Change the width of its mouth |
N/A | ESCO | User? manual | |
| 底架
Chassis |
支撐工作臺
Supporting table |
N/A | ESCO | User? manual | |
| 臺面
Stainless platform |
供操作時使用
For operation use |
N/A | ESCO | User? manual | |
| 初效過濾器
Pre-filter |
過濾空氣中的大顆粒
Trap large particles in the air |
N/A | ESCO | User? manual | |
| ULPA高效過濾器
ULPA Filter |
捕集0.3μm及以下的顆?;覊m及各種懸浮物
Trap 0.3 μm and dust particles following and various suspension |
N/A | ESCO | User? manual | |
| 鼓風機
Blower |
將空氣壓入工作臺內(nèi)部
Press air into the table inside |
N/A | ESCO | User? manual | |
| 控制面板
Control panel |
控制面板上的按鍵控制超凈工作臺的運行
The keys on the control panel to control the operation of the super clean working table |
N/A | ESCO | User? manual | |
| 照明燈Fluorescent lamp | 用于照明
Used for lighting |
N/A | ESCO | User? manual | |
| 紫外燈
Optional UV light |
用于紫外消毒
Used for ultraviolet disinfection |
N/A | ESCO | User? manual | |
| 插座
Optional electrical outlet |
可外接小型儀器
Can be connected with the small instrument |
N/A | ESCO | User? manual | |
| 萬向輪
Universal wheel |
便于移動
Easy to move |
N/A | ESCO | User? manual | |
1.4????????術語和定義Terms and Definitions
關鍵缺陷-在關鍵缺陷項目被(解決)完成之前,驗證工作不能簽署通過。
Critical Deficiency ? Validation may not be signed off until the item is closed out.
非關鍵缺陷-驗證工作可以簽署通過,可是繼續(xù)使用沒有被缺陷影響的項目。
NonCritical Deficiency ? Validation may be signed off and (continued) use of the item is not impacted by the deficiency.
2??????????責任Responsibilities
| 活動Activity | 責任方Responsible Party |
| 起草和批準方案Prepare and approve protocol | 蘇州華測生物技術有限公司CTI?BIOTECHNOLOGY(SUZHOU)CO., Ltd. |
| 協(xié)調(diào)驗證活動Coordinate Validation Protocol Activities | 驗證負責人-王雨蒙
VD-Yumeng Wang |
| 提供使用儀器或設備的許可Provide access to item | 設備負責人-王雨蒙
Maintainer-Yumeng Wang |
| 提供服務支持許可Provide contractor support and access | 上海匯析精密儀器有限公司Shanghai Huixi Precision Instrument Co., Ltd. |
| 安排測試(如果需要)Arrange laboratory testing (as required) | N/A |
| 執(zhí)行方案和起草報告Execute Protocol and prepare report | 驗證負責人-王雨蒙
VD-Yumeng Wang |
| 起草最終報告Prepare final report | 驗證負責人-王雨蒙
VD-Yumeng Wang |
| 批準最終報告Approve final report | 驗證負責人-王雨蒙
VD-Yumeng Wang 機構負責人-夏玉葉 TFM-Yuye Xia |
批準執(zhí)行方案Approval to Commence Execution of Protocol
驗證負責人VD : _____________________?日期Date:_______________________
3??????????文件Documentation
3.1????????完成本文件Completion of this Document
本文件不可復制。所有數(shù)據(jù)都必須在原始文件或附加表格上完成。每份附加表格都必須簽名和署日期。This document is not to be copied. All results must be completed on the original document or on supplementary records attached to this document. Each attachment must be signed and dated.
本文件提供的空格都必須填寫,如果不需要填寫或者不適用,應當在相應空格里說明。如果某個數(shù)字或空格不需要,劃對角線標明不適用或填入NA。All spaces provided in the IQ document must be completed. If a result is not applicable or not required this should be stated in the space provided. If a number of spaces are not required, a diagonal line through all spaces with a Not Applicable sign may be used.
本文件用黑色筆填寫This document must be completed in black pen only.
3.2????????文件列表Qualification Documents List
| 文件類型Document Type | 需要(是/否)Required?
(Yes/No) |
可用(是/否)Available? (Yes/No) | 參照文件號Reference # |
| 用戶需求規(guī)格
User requirement specification |
否
No |
||
| 功能規(guī)格
Functional Specification |
是
Yes |
||
| 圖紙
Drawings |
否
No |
||
| 裝配審計報告
Fabrication Audit Report |
否
No |
||
| 工廠可接受測試報告
Factory Acceptance Testing Report (FAT) |
否
No |
||
| 供應商手冊
Suppliers Manual |
是
Yes |
||
| 維護手冊
Procedures for Maintenance |
是
Yes |
||
| 裝配和使用程序
Procedures for Set-up and Use |
是
Yes |
||
| 其他SOP列表Other SOPs(list) | 否
No |
確認人Verified by:__________________????????日期Date:__________________
4??????????公用設施要求Utilities Requirements
4.1????????公用設施列表Utilities List
| 公用設施Utility | 要求Requirements | 實際As Measured | 可接受(是/否)Acceptable? (Yes/No) |
| 電Electricity | 220-240V/50Hz, AC |
確認人Verified by:__________________??日期Date:__________________
5??????????列舉需要計量的項目Calibration Items
列舉所有的需要檢定的項目-分類為關鍵(需要校驗)和非關鍵(僅列出)List all instrument and measuring devices ? categories into critical (under calibration) or not critical for indication only)
| 項目號Item # | 項目描述
Item Description |
是否關鍵(是/否)Critical (Yes/No) | 運行范圍Operating Range | 公差Tolerance | 再計量日期Recalibration Period |
| 1 | 平均氣流速率
The average flow rate |
是Yes | 0.4 m/s-0.6 m/s | ±20% |
確認人Verified by:__________________??日期Date:__________________
6??????????安裝、接線、安全和外觀檢查Installation, Hookup, Safety and Physical Inspection
| 條目Item | 要求Requirements | 滿意? Satisfactory? | 檢查人Checked by |
| 設備和設計規(guī)格一致嗎Equipment supplied as per design specification? | 儀器或設備與圖紙一致Drawings of equipment matched that of the machine | £Yes?? ?£No??£N/A | |
| 安全檢查Safety Inspections | 接地線已接地Verified that the item has been earthed | £Yes?? ?£No??£N/A | |
| 沒有裸露的電線No bare wire | £Yes?? ?£No??£N/A | ||
| 外觀檢查Physical Inspections | 沒有可見的裂縫或損壞No visible leak or damage on the equipment or glass mask | £Yes?? ?£No??£N/A |
確認人Verified by:__________________??日期Date:__________________
7??????????預防性維護和安全評估Preventive Maintenance and Safety Assessments
7.1?????????預防性維護Preventative Maintenance
確認是否有預防性維護方案和程序。
Verify that the Preventive Maintenance program and procedures are available.
□有Available????□沒有Not Available
確認人Verified by: ________________? ?日期Date: ________________
7.2????????安全評估Safety Assessment
確認是否需要安全評估,如果需要是否已經(jīng)執(zhí)行。
Verify that a Safety assessment is required and if so has been conducted
□需要Required ??????????????????????????□不需要Not required
□完成(如果需要)Completed (if required)? ??????□有報告Report Available
確認人Verified? by: _____________________??????日期Date: ________________
8??????????缺陷報告附件列表Deficiency Report Attachments List
一份顯示安裝確認過程中產(chǎn)生的缺陷報告和缺陷報告狀態(tài)的列表。
List deficiency reports produced during the Installation Qualification and their status. Refer to attached detailed reports.
| 缺陷報告號Deficiency Report # | 缺陷概要描述Deficiency Description Summary | 分類Classification |
完成Close out |
|
檢查人Checked by |
日期Date |
|||
| □關鍵Critical
□非關鍵Non ? Critical |
||||
9??????????批準Approvals
9.1????????臨時批準Interim Approval
如果沒有關鍵驗證缺陷調(diào)查,就直接進行最終批準。如果有關鍵缺陷就暫停批準。如果有非關鍵缺陷存在就執(zhí)行臨時批準,但不能執(zhí)行最終批準。
If there are no outstanding Critical Validation Deficiency Investigations go to final approval. If there are critical deficiencies withhold approvals. If the deficiencies are non-critical provide interim approval but not final approval.
| 頭銜Title | 姓名Name | 簽名Signature | 日期Date |
| 驗證負責人VD | 王雨蒙Yumeng Wang | ||
| QA負責人QA Manager | 劉振超Zhenchao Liu | ||
| 機構負責人TFM | 夏玉葉Yuye Xia |
9.2????????????最終批準Final Approval
執(zhí)行最終批準,當所有的缺陷都已經(jīng)解決和完成。Provide final approval when ALL deficiencies are resolved and closed out.
| 頭銜Title | 姓名Name | 簽名Signature | 日期Date |
| 驗證負責人VD | 王雨蒙Yumeng Wang | ||
| QA負責人QA Manager | 劉振超Zhenchao Liu | ||
| 機構負責人TFM | 夏玉葉Yuye Xia |
參與驗證的人在簽名記錄表簽名Include Sheet of signatures of those involved with the validation activity
簽名記錄表Signature Record
所有參與驗證的人員在下表中簽名以表明身份。All personnel involved in this qualification must complete the table below to provide identification of all the signatures/initials used in this document.
| 公司Company | 頭銜Title | 簽名Signature | 日期Date |